• DE
Suche
Skip navigation
  • Home
  • Privacy Statement
  • Contact persons
Thyssengas - Logo
Skip navigation
  • Company
  • Energy future
  • Responsibility
  • Network access
    • Control Point and measure
    • Capacity management
    • Download area network access
      • Archive
    • Tenders
      • Pre-qualification
      • Load flow commitments
      • Fuel gas
      • Flexibility
    • Tariffs
      • Network tariffs
      • Simplified tariff model according to Commission Regulation (EU) 2017/460 (NC TAR)
      • Market area conversion levy
      • Biogas allocation for Thyssengas H-gas and Thyssengas L-gas
    • Data exchange
  • Network enquiries
    • Transparency information
      • Overview
      • Information assistant
      • Network Maps
      • Structural data
      • Maintenance measures in accordance with EU Ordinance 715/2009, Annex 1, point 3.3.1. f) and g) and § 28 Thyssengas´GTC
        • Archive – Planned maintenance measures
      • Archive Maintenance Work
      • Minimum Technical Requirements
      • Network Connection
      • LNG feed-in
      • Malfunctions
      • Nomination and allocation at border crossing points
      • Gas storage data
      • Capacity determination
      • Assessment of the Long-Term Transmission Capacity Requirements according to §17 (German Gas Network Access Ordinance)
      • Interconnection- and crossborderpoints under section 40 (1) of the german gas grid access regulations, GasNZV
      • Publication of internal orders in accordance with Section 11(9) of Cooperation Agreement X
      • Process-specific parameters of SLP-procedure
      • Publication of information according to Commission Regulation (EU) 2017/460 (NC TAR)
      • Information on the proceeds from the marketing of capacities by means of an auction on the capacity booking platform
      • Monitoring report according KAP+
    • Pipeline information
    • REMIT
      • REMIT Archive
    • Data portal
    • Market space conversion
  • Newsroom
  • Careers
  • Contact
    • Contact persons
    • Purchasing
    • Address
    • Privacy Statement
      • General
      • Video
      • Voice recording
      • Application management system
      • Matomo
    • Legal notice
  • Company
  • Energy future
  • Responsibility
  • Network access
    • Control Point and measure
    • Capacity management
    • Download area network access
      • Archive
    • Tenders
      • Pre-qualification
      • Load flow commitments
      • Fuel gas
      • Flexibility
    • Tariffs
      • Network tariffs
      • Simplified tariff model according to Commission Regulation (EU) 2017/460 (NC TAR)
      • Market area conversion levy
      • Biogas allocation for Thyssengas H-gas and Thyssengas L-gas
    • Data exchange
  • Network enquiries
    • Transparency information
      • Overview
      • Information assistant
      • Network Maps
      • Structural data
      • Maintenance measures in accordance with EU Ordinance 715/2009, Annex 1, point 3.3.1. f) and g) and § 28 Thyssengas´GTC
        • Archive – Planned maintenance measures
      • Archive Maintenance Work
      • Minimum Technical Requirements
      • Network Connection
      • LNG feed-in
      • Malfunctions
      • Nomination and allocation at border crossing points
      • Gas storage data
      • Capacity determination
      • Assessment of the Long-Term Transmission Capacity Requirements according to §17 (German Gas Network Access Ordinance)
      • Interconnection- and crossborderpoints under section 40 (1) of the german gas grid access regulations, GasNZV
      • Publication of internal orders in accordance with Section 11(9) of Cooperation Agreement X
      • Process-specific parameters of SLP-procedure
      • Publication of information according to Commission Regulation (EU) 2017/460 (NC TAR)
      • Information on the proceeds from the marketing of capacities by means of an auction on the capacity booking platform
      • Monitoring report according KAP+
    • Pipeline information
    • REMIT
      • REMIT Archive
    • Data portal
    • Market space conversion
  • Newsroom
  • Careers
  • Contact
    • Contact persons
    • Purchasing
    • Address
    • Privacy Statement
      • General
      • Video
      • Voice recording
      • Application management system
      • Matomo
    • Legal notice
Thysssengas- mobil Navigation
CO2-neutrales Hosting
  • Thyssengas als Arbeitgeber bei kununu
  • Thyssengas bei Xing
  • Thyssengas als Arbeitgeber bei kununu
  • Thyssengas bei YouTube
Skip navigation
  • Equal treatment
  • Address
  • Legal notice
  • Sitemap

Copyright © 2023 Thyssengas GmbH. Durch Benutzung dieser Website akzeptieren Sie unsere Nutzungsbedingungen und Richtlinien für den Datenschutz.