Pre-qualification for participation in tenders for load flow commitments or fuel gas

All interested parties who have previously pre-qualified can participate in Thyssengas GmbH tenders for load flow commitments or fuel gas. 

As part of the pre-qualification procedure, we check, among other things, creditworthiness, availability and communication. For further information, please refer to the procedural terms.

To ensure that your pre-qualification can be completed before the bidding process begins, please email your completed and legally signed pre-qualification form, along with any attachments in PDF format, to Ausschreibung@thyssengas.com well in advance.

Load flow commitments

Tendering of load flow commitments for usage during 2027

The Thyssengas GmbH requires load flow commitments for the operation of the grid within the market area Trading Hub Europe. These serve as an instrument for the offering of firm, freely associable entry and exit capacity for transportation within the Thyssengas grid at the largest possible extent.

Thyssengas thus fulfills its obligation to take all economically reasonable measures needed for the offering of firm, freely associable entry and exit capacity at the largest possible extent, in order to prevent an intervention based on § 16 Sec. 2 EnWG [German Energy Industry Act] in order to maintain the security and reliability of the gas supply system. If there are not sufficient economically reasonable measures available after this tender, the likelihood that measures according to § 16 Sec. 2 EnWG have to be taken increases significantly for all shippers in the market area.

Thyssengas invites tenders for positive H-gas load flow commitments for the usage period from January to March and from October to December 2027.

The tender begins on June 15, 2026 and ends on July 15, 2026 at 12 noon. The offers have to be released using the offer form (version as of May 13, 2026) in a PDF-format by e-mail to ausschreibung@thyssengas.com. The signed master agreement (version as of May 15, 2025) must be submitted in a PDF-format by e-mail to the aforementioned mailbox, at the latest by the time of the submission of the offer, as well.

Tenderers are bound to their bids until August 14, 2026.

The lot size of the load flow commitments is 10 MWh/h.

Please see the following table showing the demand for load flow commitments in the individual months.

Month

Entry point group
up to ... lots
each 10 MWh/h

VIP THE-ZTP
up to … lots
each 10 MWh/h

VIP-TTF-THE-H
up to … lots
each 10 MWh/h

Overall
lots
each 10 MWh/h

Jan 27

342

64

41

342

Feb 27

342

64

41

342

Mar 27

222

64

21

222

Oct 27

30

30

21

30

Nov 27

222

64

21

222

Dec 27

342

64

41

342

The values are based on currently available information and may change as the result of new information.

To determine the ranking of the tenders Thyssengas uses the lump sum price as a basis. The lump sum price of a tendered lot for a month is defined as the sum of the demand charge and the product of the unit charge, the lot size and the predicted duration of usage. For this tender Thyssengas determines the predicted duration of usage to the amount of 24 hours. The predicted duration of usage will be used exclusively to identify the ranking of the tenders; it does not give information about the real duration of usage of the load flow commitment. For this purpose the rules of the particular master agreement and the processing rules for the call-off of load flow commitments apply exclusively.

Bids may be submitted for individual months in the usage period and accepted for individual months by Thyssengas.

The tenders are open to all suppliers who have pre-qualified and accept the terms for the pre-qualification and tendering procedure (version as of May 16, 2022).

Fuel gas

Thyssengas GmbH requires natural gas and biomethane to cover its own consumption in order to operate the gas network. The sustainable biomethane quantities are used to reduce emissions for the generation of motive power in the compressor plants, which are certified in accordance with SURE (Sustainable Resources Verification Scheme). Proof of sustainability is provided via the web application Sustainable Biomass Systems (Nabisy) of the Federal Office for Agriculture and Food.

Currently there is no tender for fuel gas.

Flexibilities

For the operation of the gas grid the Thyssengas GmbH uses injection and withdrawal capacity as well as working gas volume of storages which are directly connected with the Thyssengas transportation grid.

Currently there is no tender for storage capacity.

If you have any queries, please contact:

Portrait von Thyssengas-Mitarbeiter Markus Rottmann vor modernem Bürohintergrund.
Markus Rottmann
Gaswirtschaftliche Produkte

Downloads for gas trading products

Filter

7 result results
Load flow commitments

Tender results

version as of August 13, 2025

pdf
181 KB
Load flow commitments

Master agreement positive load flow commitment H-Gas

version as of May 15, 2025

pdf
166 KB
Load flow commitments

Processing rules for the call-off of load flow commitments

version as of May 15, 2025

pdf
113 KB
Prequalification

Pre-qualification form

version as of May 16, 2022

pdf
97 KB
Prequalification

Terms for the pre-qualification and tendering procedure

version as of May 16, 2022

pdf
119 KB
Fuel gas

Master agreement supply of fuel gas

version as of September 18, 2025

pdf
232 KB
unfortunately, we could not find a suitable result for these filter options. please adjust the filters.