REMIT Informations

The disclosure of information pursuant to Art. 4 (1) of EU Regulation No. 1227/2011 for Thyssengas GmbH, EI-Code 21X-DE-G-A0A0A-U has been published on the ENTSOG transparency platform since 14 February 2017 under the following link:

ENTSOG website


If the accessibility of the ENTSOG transparency platform is restricted in the event of a REMIT publication, the notification will be made on this page instead.

REMIT Archiv

30.09.2021 18:55:12

Event Start: 30.09.2021 17:00pm
Event Stop: 01.10.2021 06:00am

Due to an unexpected issue only at the network point "VIP TTF-THE-L Entry ". No day-ahead-bookings; no WID DZK bookings, other Within-day auctions possible.
All other network points are not affected.

Please do not hesitate to contact your known Thyssengas contact person.
We apologize for any inconvenience that this disturbance may cause

23.09.2021 11:24:26

IT Downtime; No FCFS bookings and Within-day auctions possible from 27 September 2021, 09:00 am till approx. 27 September 2021, 13:30 pm. The VIP-TTF-NCG-L is not affected.
No (re-)nomination and matching possible from 27 September 2021, 07:00 am till approx. 27 September 2021, 13:30 pm. The VIP-TTF-NCG-L and the IP Zevenaar are not affected.

21.09.2021 17:49:46

Processing of nomination data (NOMINT/NOMRES/DELORD/DELRES) is possible. IT-problems are solved.

21.09.2021 14:43:31

No processing of nomination data (NOMINT/NOMRES/DELORD/DELRES) possible at the moment due to IT-problems.

06.08.2021 18:13:08

DE:
Auf Grund von Systemproblemen ist derzeit kein Versand von Withinday Produkten möglich. Die unterbrechbaren Tagesprodukte konnten nicht an Prisma gesendet werden.

EN:
Due to problems with our IT, it is currently not possible to upload Withinday products. The interruptible daily products could also not be sent to Prisma.

25.06.2021 10:26:40

The maintenance measure must be extended by three days (27.06.2021 06:00 am - 30.06.2021 06:00 am) for operational reasons at following netpoints: Entry Emden EPT and EmsbÃŒren-Berge as well as Exit Epe/Xanten and Epe IV. Within-day, day-ahead and auctions and Nomination are not possible

27.05.2021 15:58:59

IT Downtime: No FCFS bookings and Within-day auctions possible from 31 May 2021, 09:00 am till approx. 31 May 12:30 pm. The VIP-TTF-NCG-L is not affected.
No (re-)nomination and matching possible from 31 May 2021, 07:00 am till approx. 31 May 2021, 12:30 pm. The VIP-TTF-NCG-L and the IP Zevenaar are not affected.

27.05.2021 12:25:20

From 1 January 2022 the network tariff at all IPs and entries/exits connected to storages (undiscounted) is 3.51 EUR/(kWh/h)/y for the FZK product, 3.0888 EUR /(kWh/h)/y for the bFZK_temp1 product, 2.8782 EUR/(kWh/h)/y for the bFZK_temp2 product, 3.159 EUR/(kWh/h)/y for the load-dependent bFZK product and 3.159 EUR/(kWh/h)/y for the DZK entry product, according to Commission Regulation (EU) 2017/460 (NC TAR). Due to pending appeal proceedings such tariffs might be changed before the yearly capacity auction on short notice.

13.02.2017 11:17:08 Uhr

DE: Due to IT maintenance work on 22 February 2017, no FCFS bookings and within-day auctions can be carried out on Prisma between 07:30 and presumably 11:30. (Re-)nominations cannot be processed between 05:00 and presumably 11:30.

EN: Due to IT maintenance on 22 February 2017 there are no within-day auctions and FCFS bookings possible between 07:30 am till approx. 11:30 am on Prisma. (Re-)Nominations can not be processed between 05:00 am till approx. 11:30 am.

06.06.2014 14:30 Uhr

In the auctions of the quarters Q4/2014 - Q3/2015 on 3 June 2014, available unbundled capacity products of Thyssengas GmbH at the entry point Zevenaar were offered incompletely due to a system error in the calculation of long-term bundled capacity products by PRISMA. The auctions of the quarters Q4/2014 - Q3/2015 for the not offered unbundled capacity products at the entry point Zevenaar will be rescheduled. The following unbundled capacity products will then be offered:

  • 01.10.2014 - 01.01.2015: 3,146,931 kWh/h
  • 01.01.2015 - 01.04.2015: 2,883,155 kWh/h
  • 01/04/2015 - 01/07/2015: 2,883,155 kWh/h
  • 01/07/2015 - 01/10/2015: 2,883,155 kWh/h

We will inform you separately of the specific date on which the auctions will be held. Due to the ongoing quarterly auctions on PRISMA, it is unfortunately not yet possible to give a date.

21.05.2014 15:40

The technical maximum capacity at the Bocholtz - Vetschau station (03200008) will be increased from 1,000,000 kWh/h to 1,325,000 kWh/h from today. The maximum bookable capacity on a firm basis of 1,000,000 kWh/h remains unchanged. The additional capacity can only be booked on an interruptible basis.

19.05.2014 13:30

Thyssengas will offer bundled firm capacity at the cross-border interconnection points with Gasunie Transport Services in "Zevenaar" and "Bocholtz-Vetschau" for the first time in the quarterly auction on 3 June 2014. Monthly products will be offered bundled for the first time in September 2014 for October 2014. The marketing of bundled annual capacity at the aforementioned points will begin in 2015.

16.05.2014 12:00

Invitation to tender for load flow commitments for quarter 4/2014 and the 2015 calendar year

27.03.2014 12:10 pm

Announcement of measures as part of the L-H gas market area changeover in 2017.

29.11.2013 11:20 Uhr

Publication of the final Thyssengas charges for 2014 at:

Network charges