Natural gas pipelines will be uncovered and civil engineering and pipeline work will be carried out at the locations mentioned. The planning and realisation of the measure will be carried out in close coordination with representatives of the municipality of Erwitte and the responsible authorities. Thyssengas asks for your understanding for the resulting inconvenience.