The work is connected with the future hydrogen pipeline between Uedemerbruch and Xanten. Next year, the existing pipeline in this area will undergo a technical inspection. To this end, a so-called pig must be run through the pipeline. During the work, a loop will be created to allow the pig to change direction.
The planning and implementation of this project are being carried out in close consultation with representatives of the town of Xanten and the relevant authorities. Thyssengas asks for your understanding regarding any inconvenience caused.