On Tuesday, 7 July 2026, the remaining quantity will be flared off using a mobile flare system. This may result in increased noise levels and a visible flame on that day. The flare system is located on the pavement on Moselstraße (at the junction with Elisabethstraße) in Alsdorf. Pedestrians can cross to the other side of the road at this point.
Press release