Archive Maintenance Work

published onMarket areaSection concernedCommentTimeframeEffect on capacity
(currently still optional)
NCG H-Gas Entry points: Bocholtz-Vetschau, Broichweiden Süd, Emden EMS/EPT, Emden PPC/NPT, Emsbüren, Lichtenbusch, Emlichheim-Kalle-1 (UGS-E), EPE-III (UGS-E); Epe-(UGS-E)-I,  Leer-Mooräcker-1 (UGS-E), Leer-Mooräcker-3 (UGS-E), Xanten-1 (UGS-E) replacement of station Ochtrup - Wester 10 Scheduled from 18.08.2014 06:00 am to 02.09.2014 06:00 am Nominations will be accepted, possible reductions will be communicated via the agreed way
NCG H-Gas Entry points: Gronau-Epe-11 (UGS-E),Gronau-Epe-13 (UGS-E) replacement of station Ochtrup - Wester 10 Scheduled from 18.08.2014 06:00 am to 02.09.2014 06:00 am Nominations are not accepted and are reduced to zero
NCG H-Gas Exit- points: Epe IV (UGS-A) , Epe-II (UGS-A) replacement of station Ochtrup - Wester 10 Scheduled from 18.08.2014 06:00 am to 02.09.2014 06:00 am Nominations will be accepted, possible reductions will be communicated via the agreed way
NCG H-Gas Exit- point: Kalle-(UGS-A) replacement of station Ochtrup - Wester 10 Scheduled from 18.08.2014 06:00 am to 02.09.2014 06:00 am Nominations are not accepted and are reduced to zero
NCG H-GasCompressor-Station Rysum and Pipeline from Emden to EmsbürenMaintenance work at compressor-station Rysum (Rysum Total Shut Down). Capacity reduction up to 100%.Scheduled from 13.05.2013 06:00 am to 17.05.2013 06:00 amBecause of Compressor-Maintenance capacity reduction up to 100%. Impossibility for nominations for several days. Target date will be filed subsequently.
06.01.2012NCG H-GasCompressor-Station Rysum and Pipeline from Emden to EmsbürenMaintenance work at compressor-station Rysum and pipeline-systemScheduled from 20.05.2012  06:00 am to 26.05.2012  06:00 amBecause of Compressor-Maintenance capacity reduction up to 100%. Impossibility for nominations for several days. Target date will be filed subsequently
10.11.2011NCG H-GasMÜT Broichweiden-Süd and GÜP Bocholtz Vetschaumaintenance work at pipeline-systemScheduled from 07.11.2011  06:00 am to 11.11.2011  06:00 amImpossibility for nominations
20.10.2011NCG H-GasMÜT Broichweiden-Süd and GÜP Bocholtz Vetschaumaintenance work at pipeline-systemScheduled from 07.11.2011  06:00 am to 12.11.2011  06:00 amImpossibility for nominations
11.10.2011NCG H-GasMÜT Broichweiden-Süd and Bocholtz Vetschaumaintenance work at pipeline-systemScheduled between 17.10.2011  06:00 am and 01.01.2012  06:00 am for max 5 daysImpossibility for nominations
09.09.2011NCG H-GasMÜT-Broichweiden-Südmaintenance workScheduled from 15.09.2011  06:00 am to 27.09.2011  06:00 amImpossibility for nominations
09.09.2011NCG L-GasNETG Compressorstation Eltenmaintenance workScheduled from 20.09.2011 to 21.09.2011Restrictions are expected
09.09.2011NCG H-GasMÜT Broichweiden-Süd and Bocholtz Vetschaumaintenance work at pipeline-systemScheduled from 10.10.2011  06:00 am to 15.10.2011  06:00 amImpossibility for nominations
06.09.2011NCG H-GasMÜT-Broichweiden-Südmaintenance workScheduled from 15.09.2011  06:00 am to 27.09.2011  06:00 amImpossibility for nominations
06.09.2011NCG L-GasNETG Compressorstation Eltenmaintenance workScheduled from 20.09.2011 to 21.09.2011Restrictions are expected
06.09.2011NCG H-GasMÜT Broichweiden-Süd and Bocholtz Vetschaumaintenance work at pipeline-systemOktober 2011, 4 daysTarget date will be filed subsequently. Impossibility for nominations for 4 dedicated days
22.08.2011NCG H-GasMÜT-Broichweiden-Südmaintenance workScheduled from 15.09.2011  06:00 am to 27.09.2011  06:00 amImpossibility for nominations
22.08.2011NCG L-GasNETG Compressorstation Eltenmaintenance workScheduled from 20.09.2011 to 21.09.2011Restrictions are expected
22.08.2011NCG H-GasMÜT-Broichweiden-Südmaintenance workScheduled from 15.09.2011  06:00 am to 27.09.2011  06:00 amImpossibility for nominations
22.08.2011NCG L-GasNETG Compressorstation Eltenmaintenance workScheduled from 20.09.2011 to 21.09.2011Impossibility for nominations
09.08.2011NCG H-GasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 10 Untensiebeneick (End) and pipeline nr. 202/3 Untensiebeneick-Varresbeck, whole pipelinemaintenance workIII. quarter 2011, 3 daysTarget date will be filed subsequently! Impossibility for nominations for one dedicated day
09.08.2011NCG H-GasMÜT-Broichweiden-Südmaintenance workScheduled from 15.09.2011  06:00 am to 27.09.2011  06:00 amImpossibility for nominations
03.08.2011NCG H-GasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 10 Untensiebeneick (End) and pipeline nr. 202/3 Untensiebeneick-Varresbeck, whole pipelinemaintenance workIII. quarter 2011, 3 daysTarget date will be filed subsequently! Impossibility for nominations for one dedicated day
03.08.2011NCG H-GasMÜT-Broichweiden-Südmaintenance workScheduled KW38/2011 to KW 39/2011Target date will be filed subsequently! Impossibility for nominations
12.07.2011NCG H-GasBroichweiden gas mixing facilityStation conversionsScheduled May 2009 to around KW 30/2011Gas mixing facility is not available
12.07.2011NCG H-GasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 10 Untensiebeneick (End) and pipeline nr. 202/3 Untensiebeneick-Varresbeck, whole pipelinemaintenance workIII. quarter 2011, 3 daysTarget date will be filed subsequently! Impossibility for nominations for one dedicated day
16.05.2011NCG H-GasBroichweiden gas mixing facilityStation conversionsScheduled May 2009 to around KW 24/2011Gas mixing facility is not available
16.05.2011NCG H-GasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 10 Untensiebeneick (End) and pipeline nr. 202/3 Untensiebeneick-Varresbeck, whole pipelinemaintenance workIII. quarter 2011, 3 daysTarget date will be filed subsequently! Impossibility for nominations for one dedicated day
16.05.2011NCG H-GasGDRM Bocholtz-Vetschaumaintenance workfrom 20.06.2011 08:00 am to around 20.06.2011 18:00 amImpossibility for nominations
02.05.2011NCG H-GasBroichweiden gas mixing facilityStation conversionsScheduled May 2009 to around KW 24/2011Gas mixing facility is not available
02.05.2011NCG H-GasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 9 Velbert, and pipeline nr. 202/16 2. AL RKW Wülfrathmaintenance work at branch valveII. quarter 2011Target date will be filed subsequently! Impossibility for nominations for one dedicated day
02.05.2011NCG H-GasCompressor Station Rysum (Emden)Station Shut downfrom 08.05.2011 06:00 am to around 14.05.2011 06:00 amImpossibility for nominations, if necessary
02.05.2011NCG H-GasEmsbüren RWE (VEW) Maintenance work at Compressor Station Rysumfrom 08.05.2011 06:00 am to around 14.05.2011 06:00 amImpossibility for nominations, if necessary
02.05.2011NCG H-GasBroichweiden gas mixing facilityStation conversionsScheduled May 2009 to around KW 24/2011Gas mixing facility is not available
02.05.2011NCG H-GasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 9 Velbert, and pipeline nr. 202/16 2. AL RKW Wülfrathmaintenance work at branch valveII. quarter 2011Target date will be filed subsequently! Impossibility for nominations for one dedicated day
02.05.2011NCG H-GasCompressor Station RysumStation Shut downfrom 08.05.2011 06:00 am to around 14.05.2011 06:00 amImpossibility for nominations, if necessary
02.05.2011NCG H-GasExit KW LingenMaintenance work at Compressor Station Rysumfrom 08.05.2011 06:00 am to around 14.05.2011 06:00 amImpossibility for nominations, if necessary
15.04.2011NCG H-GasBroichweiden gas mixing facilityStation conversionsScheduled May 2009 to around KW 24/2011Gas mixing facility is not available
15.04.2011NCG H-GasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 9 Velbert, and pipeline nr. 202/16 2. AL RKW Wülfrathmaintenance work at branch valveII. quarter 2011Target date will be filed subsequently! Impossibility for nominations for one dedicated day
15.04.2011Thyssengas H-gasBroichweiden gas mixing facilityStation conversionsScheduled May 2009 to around KW 24/2011Gas mixing facility is not available
15.04.2011Thyssengas H-gasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 9 Velbert, and pipeline nr. 202/16 2. AL RKW Wülfrathmaintenance work at branch valveII. quarter 2011Target date will be filed subsequently! Impossibility for nominations for one dedicated day
18.03.2011Thyssengas H-gasBroichweiden gas mixing facilityStation conversionsScheduled May 2009 to around KW 18/2011Gas mixing facility is not available
18.03.2011Thyssengas H-gasPipeline nr. 202 Hüls-Untensiebeneick, from ASt 8b Velbert-West to ASt 9 Velbert, and pipeline nr. 202/16 2. AL RKW Wülfrathmaintenance work at branch valveII. quarter 2011Target date will be filed subsequently! Impossibility for nominations for one dedicated day
03.02.2011Thyssengas H-gasBroichweiden gas mixing facilityStation conversionsScheduled May 2009 to around KW 14/2011Gas mixing facility is not available